Plant 103 Jun 2026

Manufacturing · Operations

Inventory & BOM Dashboard

Stock position, product bills-of-materials and AI-generated supply nudges — all in one place. Use the side menu to jump to a section.

10 AI nudges

Total inventory value

₹28.10 Cr

42 SKUs across 4 stock categories

Critical RM at risk

Action

5raw materials

₹77.9 L exposed to stockout

Excess / slow-moving

₹1.56 Cr

Capital tied up above norm

Avg RM lead time

15 days

20 products · 46,830 units/mo

Stock & Material Catalogue

Switch between category totals and the full searchable material list. Expand a category to see every SKU at that level.

Critical RM

₹4.17 Cr

8 SKUs · 15% · 4 at risk

RM

₹7.27 Cr

22 SKUs · 26% · 1 at risk

SFG

₹2.50 Cr

6 SKUs · 9%

FG

₹14.16 Cr

6 SKUs · 50%

Total stock value ₹28.10 Cr

CodeMaterialOn handUnit costValueCoverLeadStatus
CRM-06Base Metal Alloy· Supplier F (Domestic)1,42,000 kg₹215₹3.05 Cr27d18dHealthy
CRM-04Optical Sensor Wafer· Supplier D (Import)96,000 pcs₹38₹36.5 L14d26dStockout risk
CRM-03Control Processor Chip· Supplier C (Import)5,100 pcs₹420₹21.4 L54d30dHealthy
CRM-05Monitoring Circuit Assembly· Supplier E (Domestic)880 pcs₹1,850₹16.3 L31d24dHealthy
CRM-01Energy Storage Cell· Supplier A (Import)3,200 unit₹480₹15.4 L15d35dStockout risk
CRM-08High-Current Switch Component· Supplier H (Import)11,200 pcs₹78₹8.7 L15d22dStockout risk
CRM-07Magnetic Core Unit· Supplier G (Domestic)7,400 pcs₹95₹7.0 L23d21dHealthy
CRM-02Power Switching Module· Supplier B (Import)540 pcs₹1,250₹6.8 L21d28dStockout risk

Aging & scrap

Track how long raw materials have been in store against their shelf life. Critical RM that ages out is moved to scrap and booked as a loss.

Raw-material aging

How long current RM / Critical RM stock has been sitting against its shelf life. Near-shelf items are scrap candidates.

2 near shelf life

0–30d

7

₹1.97 Cr

31–60d

7

₹4.97 Cr

61–90d

4

₹56.9 L

91–180d

10

₹2.21 Cr

180d+

2

₹1.73 Cr

CodeMaterialCat.Age vs shelf lifeValueStatus
RM-12Flexible Ribbon StripRM
224d / 300d
₹16.7 LAging
RM-07Toughened Glass SheetRM
205d / 300d
₹1.56 CrAging
CRM-05Monitoring Circuit AssemblyCritical RM
171d / 180d
₹16.3 LNear shelf life
CRM-02Power Switching ModuleCritical RM
152d / 180d
₹6.8 LNear shelf life
RM-19Display Module PanelRM
142d / 300d
₹10.6 LFresh
CRM-04Optical Sensor WaferCritical RM
138d / 180d
₹36.5 LAging
CRM-08High-Current Switch ComponentCritical RM
119d / 180d
₹8.7 LAging
RM-05Extruded Metal ProfileRM
109d / 300d
₹21.4 LFresh

Scrap & write-off — aged-out Critical RM

Critical raw materials that finished their shelf life and were moved to scrap, booking a loss this year.

Scrap loss (YTD)

₹9.5 L

Items scrapped

6 lines

Units written off

7,935

CodeMaterialQtyAgedScrapped onReasonLoss
CRM-01Energy Storage Cell480 unit198d22 May 2026Quality degraded below spec after shelf life₹2,30,400
CRM-05Monitoring Circuit Assembly95 pcs205d10 May 2026Revision superseded, shelf life exceeded₹1,75,750
CRM-04Optical Sensor Wafer5,200 pcs240d18 Mar 2026Surface defects after prolonged storage₹1,97,600
CRM-02Power Switching Module60 pcs190d30 Apr 2026Obsolete revision — superseded part₹75,000
CRM-03Control Processor Chip300 pcs220d02 May 2026Sensitive component past shelf-life limit₹1,26,000
CRM-08High-Current Switch Component1,800 pcs262d27 Feb 2026Surface oxidation — failed quality check₹1,40,400
Total₹9,45,150

AI nudges

Auto-generated from current stock, consumption and lead times — each pairs a finding with a recommended action and ₹ impact, ordered by severity.

CriticalStockout risk₹69.9 L

Optical Sensor Wafer — 14d cover vs 26d lead time

Stock runs out in ~14 days but replenishment takes 26 days from Supplier D (Import) (single-source). Raise a PO for ~1,84,000 pcs now to avoid a line stoppage.

CriticalStockout risk₹15.8 L

Display Module Panel — 14d cover vs 15d lead time

Stock runs out in ~14 days but replenishment takes 15 days from Supplier 17 (Import). Raise a PO for ~18,000 pcs now to avoid a line stoppage.

CriticalStockout risk₹14.7 L

High-Current Switch Component — 14d cover vs 22d lead time

Stock runs out in ~14 days but replenishment takes 22 days from Supplier H (Import) (single-source). Raise a PO for ~18,800 pcs now to avoid a line stoppage.

CriticalStockout risk₹27.8 L

Energy Storage Cell — 15d cover vs 35d lead time

Stock runs out in ~15 days but replenishment takes 35 days from Supplier A (Import) (single-source). Raise a PO for ~5,800 unit now to avoid a line stoppage.

CriticalStockout risk₹10.8 L

Power Switching Module — 20d cover vs 28d lead time

Stock runs out in ~20 days but replenishment takes 28 days from Supplier B (Import) (single-source). Raise a PO for ~860 pcs now to avoid a line stoppage.

WarningExcess capital₹82.0 L

Toughened Glass Sheet — 111% above norm (158d cover)

Holding 38,000 pcs (₹82.0 L above norm). Defer the next Supplier 7 order and reallocate the freed capital.

WarningLead-time bottleneck

Control Processor Chip gates 10 products' lead time

At 30 days it is the longest-lead component for Model A1, Model A2, Model A3 +7 more. Carrying buffer stock here shortens the critical path for the whole group.

WarningAging / scrap risk₹16.3 L

Monitoring Circuit Assembly has aged 171d of 180d shelf life

2 critical-RM lines are approaching end of shelf life. Consume or redeploy Monitoring Circuit Assembly before it joins the ₹9.5 L already written off to scrap this year.

OpportunityRe-order

6 items below re-order level — act before they turn critical

Finished Good D — finished stock leads the list at 7d cover. Batch these into a single consolidated PO cycle to cut freight and admin while staying ahead of the 2d lead time.

InsightConcentration₹4.17 Cr

Critical RM is 15% of inventory value

₹4.17 Cr is tied up in critical raw materials, many single-sourced and imported. Prioritise dual-sourcing and safety-stock review on these to de-risk the line.

Products & Bill-of-Materials

Filter by family, then expand any product to map its raw materials and lead times. The longest-lead item sets the critical path.